4 Guys 1 Dog and lots of Teak deck removal on a Baba 35
This is a video from the archives as the teak was being removed. The teak on the Baba 35 is held down really well by caulking and epoxy and it is hard to remove. It took weeks of laborious work to remove most of it. The fittings on the deck had rusted fasteners that made it difficult to remove them cleanly.
I need to repair the deck to get the boat ready for the Golden Globe Race. Need a great watertight deck in the southern ocean.
Follow the journey:
Website: https://www.gauravshinde.com/
Instagram: https://www.instagram.com/goldengloberaceg/
Facebook: https://www.facebook.com/gauravshindesailing
Support my race prep here: https://www.gauravshinde.com/becomeabulkhead
https://www.windathletes.ca/athletes/gaurav-shinde-golden-globe-race-2022
Video by: Yegnesh Kalyanakrishnan https://www.yegnesh.com/